RDF installation Birmingham UK
RDF installation Birmingham UK made by Walair Separation Systems with an input of 30/40 t/h of MSW waste, where the light fraction is separated and being used as RDF waste.
RDF installation Birmingham UK made by Walair Separation Systems with an input of 30/40 t/h of MSW waste, where the light fraction is separated and being used as RDF waste.